SGI IS2224 Guia de preparacion Pagina 46

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 102
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 45
30 007-5923-001
2: ISS3112-RP2 Server, MIS JBOD and IS2224 JBOD NAS System Hardware Installation
Installing the Inner Rolling Rails
1. Align the rolling rails to the chassis so that the word “FRONT” is at the front of the chassis
Note: The word “FRONT” will be upside-down on one side of the chassis, reference Figure 2-12.
Figure 2-12 Align Rails to Front
2. Locate the six support tabs along the side of the chassis (see Figure 2-13 on page 31).
sgi
Vista de pagina 45
1 2 ... 41 42 43 44 45 46 47 48 49 50 51 ... 101 102

Comentarios a estos manuales

Sin comentarios