SGI IS2224 Guia de preparacion Pagina 48

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 102
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 47
32 007-5923-001
2: ISS3112-RP2 Server, MIS JBOD and IS2224 JBOD NAS System Hardware Installation
Figure 2-14 Lock on to Support Tabs
4. Using the included screws, attach the rolling rail to the chassis. Make sure the screw heads
are counter-sunk, so as not to catch on anything when rolling in the rack.
5. You may have to move aside a safety latch in order to install some rolling rail screws. Be
sure to set the safety latches back to their home positions after rolling rail installation is
complete (see Figure 2-15 on page 33).
6. Do this for both sides.
sgi
Vista de pagina 47
1 2 ... 43 44 45 46 47 48 49 50 51 52 53 ... 101 102

Comentarios a estos manuales

Sin comentarios