SGI Octane III Guía de usuario Pagina 14

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 78
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 13
2 007-5630-001
1: Introduction and Overview
Quick Setup Procedures
Use the information in the following subsections to get your Octane III unpacked, set up and
working in your office or lab environment. If your system ships with hardware, software or media
not listed in this guide, please see its accompanying documentation for installation instructions.
Unpacking the System
Open the SGI Octane III system packaging container and inspect all shipped items for evidence
of mishandling during transit. If the contents appear damaged, file a damage claim with the carrier
immediately.
Caution: To avoid personal injury when unloading the system, use two people when rolling the
system off the shipping pallet. The system can weigh up to approximately 178 pounds (81 kg).
Use the following steps and Figure 1-1 on page 3 to properly unpack your Octane III system:
1. After you have cut the package banding and opened the top, remove the wood ramp and
place it near the front of the pallet, then pull out and remove the two cushioned top pads.
2. Check that the following items are included and note that a DVD-RW drive and
monitor/keyboard/mouse may come as separately packaged options:
SGI Octane III deskside system
System power cords
Silicon Graphics or 3rd party software CDs
SGI Octane III Deskside Workstation Users Guide (this document)
3. Remove any items packaged at the top of the box, then pull up the corrugated sleeve and lift
off the anti-static plastic cover.
4. Extract the two bolts that hold the front brace to the shipping pallet assembly and remove it.
5. Align the two bolt holes on the end of the ramp (removed in step 1) with the holes on the
front of the shipping pallet, then push the bolts into place to secure the ramp.
6. Use two people to slowly roll the Octane III system off the pallet and down the ramp.
7. Roll the system carefully into the operation location and position it for setup.
Vista de pagina 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 77 78

Comentarios a estos manuales

Sin comentarios